May 5 2017: Yes today was the day that my beautiful wife and I decided to hang the 2×6’s from the rafters as well as emplace the cedar posts.

The day started off early with Savannah and I going out to hang the 2×6’s from the rafters. This entailed me climbing the ladder with her lifting via a rope attached to the 2×6 over a rafter the member into place so I can screw it in. Actually this worked rather well and with me cutting plates or 2×6 scraps that attach the 2×6 reinforcements together we soon had the rafters tied together in short order.

What was next consisted of cutting, hoisting and attaching the aforementioned cedar poles to the 2×6 reinforcements. Doing this required me to measure at the pre –determined increments the exact height from the floor to the 2×6’s, and cutting the poles with my chainsaw as well as my sawzall to length. Attaching them required lifting the poles with a rope over rafters much like the 2×6’s and hammering them plum. Affixing the poles to the reinforcements had me using a 5” lag screw passing through the 2×6 into the pole. Thankfully having this done in my shop allowed me to use my pneumatic impact driver to drive the lag screws.

This entire exercise took all day, yet at the end of the day, Savannah and I are quite confident that the entire structure will now be able to flip the boat as required.

    Leave a Reply

    Your email address will not be published. Required fields are marked *