Had to mow and edge the lawn tonight, so didn’t get to do much, but did have time for a quick batch of epoxy and do most of the forward window sealing. Just a bit more to go.

When I was starting my build, I considered using another location, but having things "handy" where I can just step out and work on it sounded like it would be a good thing. In that I was right. Having it right there, I got 15 minutes of work in that wouldn’t have happened if I had to drive somewhere.

Time = 15 minutes