Received another gallon of epoxy from U.S. Composites today. That let’s me start filling and patching some "bad" places on the windows and around. I hope this is the last gallon I’ll need, but I’ll believe that when I get done 🙂

Got things unpacked, poured the last little bit of resin from the old container in, and got some patching done. Went around all the windows and that pretty much finished out daylight before supper.

Money = $61.00 + $10.70 (shipping) = $71.70

Time = 1 hour