Spent a while pouring over the plans and figuring out where the cabin posts were. I had sent the designer a question regarding the size of some of these support posts. Felt kind of dumb when he immediately pointed out that the information I was looking for was on sheet 10 of the plan set.

Loaded up with Dane and we bought lumber for the cabin posts and some lag screws for fastening it.

Money = $45.94 (wood and lag screws) + $3.22 (tax) = $49.17

Time = 1 hour