Well, probably a short entry, but did actually make a little progress today. Got the other chine taped/epoxied and got another piece of the keel on. That took longer than expected since I had to fill the "crack" under it. Once the first layer is on (and hopefully straight!), the rest should stack up fairly quickly. Once I get the next layer on I’ve got to put bolts through the inner keel to hold the entire assembly together.

Time = 2 hours